Hybrid heat pump in Apeldoorn
- Service area
- Apeldoorn Checked
- Project
- Hybrid heat pump Checked
- Existing heating
- Gas boiler Stated
- Property type
- Terraced house, 1980s Stated
- Insulation
- Double glazing and roof insulation, according to the applicant Stated
- Budget
- To be confirmed To be confirmed
- Timing
- Within 6 months Checked